The Green Line Extension Project Team will hold a public meeting to review the latest design plans for retaining walls and noise walls along the corridor.
The construction of the Green Line will require the widening of the existing rail corridor which will include the construction of more than 25,000 linear feet of retaining walls and noise walls. This meeting will be the first in a series of meetings to provide general information on wall types, heights and where these wall types may be proposed along the corridor.
The meeting will be held Tuesday, May 22, 6:00-8:00pm, at the Holiday Inn Hotel Somerville, 30 Washington Street.
If you need access or language accommodations to fully participate in this public meeting, please contact Karen Arpino-Shaffer at 617-426-9570 or kshaffer@gilbaneco.com at least one week before the event.
More information about the project is available on the Green Line Extension website at: www.mass.gov/greenlineextension.
As always, if you have any questions on the Green Line Extension Project, you can email us at info@glxinfo.com.




The meeting was run very well and was very informative.
Please post a link on http://greenlineextension.eot.state.ma.us/documents.html to the Powerpoint slides and all of the Maps we saw at the meeting.
Posted by: Friends of the Community Path | May 26, 2012 at 08:08 AM
I'm curious when if the construction activity will subsite on the Sagamore bridge before Memorial Day weekend?
----------------------------------------------------------------------------
The U.S. Army Corps of Engineers says work will continue until the beginning of the Memorial Day weekend.
Posted by: Jason Harmon | May 11, 2012 at 12:40 PM