When will construction work begin?

It's June 29, 2012 and yet there's not a backhoe in sight -- not even a guy in a hard hat.
----------------------------------------------------------------------------
Work began a few weeks ago. The bulk of work for the summer is 'in the lake' with little impact to the existing structure- borings at the proposed pile locations.

Heavier construction in the lake should start in September - with pile driving.

As work proceeds, more specific two-week work schedules will be posted online.